seat.htm floor.htm walls.htm wash paint floor.htm steps and door.htm co pilot.htm firing strips.htm heaters.htm lights decals.htm insulation.htm origin_of_merlyn.htm framing.htm bedroom.htm paint.htm lighting.htm hot water heater.htm counter.htm bathroom.htm paintday.htm inside.htm mechanical.htm electrical.htm shower.htm gallery.htm

 

second coat of primer ,

rubber sheeting that has been sealed to to the floor where all the seat bolt holes were

and Firing strips  4in wide made for marine grade plywood have been glued and screwed to the floor.