seat.htm floor.htm walls.htm wash paint floor.htm steps and door.htm co pilot.htm firing strips.htm heaters.htm lights decals.htm insulation.htm origin_of_merlyn.htm framing.htm bedroom.htm paint.htm lighting.htm hot water heater.htm counter.htm bathroom.htm paintday.htm inside.htm mechanical.htm electrical.htm shower.htm gallery.htm

 

 

 

         plywood going up

        wall

 

in the planning and thought part of the job,  it really is just build it on the fly

                       

framing over the wheel wells shower pan test run.

the center will be the battery box for solar system